Show oil construction OF if people pay up december conference may be held in new building walking up on east center towards the richfield Rich neld high school a careful observer is delighted to see the good progress that has been made in building the new talmer tabernacle nacle the outer walls are up to the height of the ceiling of the basement most of the material including the ich e heavy supports for the floors lumber face bricks etc is on hand and not only the rough work is going ahead very nicely but even the decorative part of the structure is bein being started stones faced with banit granite e chi chips s are already laid on the a east t sd side of E the building where one stairway will vill go up t towards ards the main entrance A stairway of tho the same sort will ivill be built on the west side the main hall or auditorium of the building will be by 60 feet and of the feet thirty feet will be taken up by an up tolate to late date stage which will be arranged in such a way that the front part of it can also be used as a speakers platform president dent john christensen chairman ina II 11 of the tha building committee is taking an active interest in the construction st work and can be seen at the premises nearly all day supervising assisting advising etc when asked by our representative whether it will be possible to hold the december conference in the new ta tabernacle b L rn t c I 1 e pre president q i christensen doubtingly shook his head but added if people pay up we ne might be able to complete the building by that time so we can hold our cont ference here |