OCR Text |
Show Two Hundred Thousand Gallon Water TanlTTo Be Built By Pleasant Grove A new L'OOyOOO gallon capacity ("in'iit reinforced water tank will. i built at the mouth of Rattle i 'icek Canyon in the very near future,' fut-ure,' according to Joseph Dickers'.;!, Dicker-s'.;!, chairman' of the water works committee of Pleasant Grove City. The new tank is being built to serve the Eastern and Southeaster Southeast-er areas of the city and will cost approximately $20,000. Under the present system J some of the homes in the upper end of the city have not had sufficient water, and these homes will be attached to the new pipeline, which will adequately take care of that area. Mr. Dickerson reports that a six inch line will carry the water down Battle Creek road and then a four inch line will run south along the Nat Loader street, and take care of homes that will be constructed in the extreme south side of the city. |