OCR Text |
Show Norris Dam Is One-Third Completed 1 ii.inM iinnnmn.nHHnmn r. , .,lfi t ww.v vttf TVmmrMtfoiiitfXti&e The Tennessee Valley authority's $39,000,000 power and flooc control dam on the Clinch river, near Knox-ville, Knox-ville, is now one-third finished. Over 10 per cent of the concrete for the dam has been poured. When finished two and one-half years from now, It will stand 253 feet high, eliminating all future floods on the Clinch and reducing materially the flood stages on the Tennessee river itself. |