Show P H S ATHLETIC FIELD CLEARED AND LEVELED through the efforts of the county commissioners iron county school board and the parowan carowan elchan exchange e club all cooperating foundation work was completed for the athletic field which will be built in par owan sometime next summer or fall the grounds purchased by the school board for this project lying along first west street between second and third north and which have been an eyesore to the community for several months were cleaned up during the week iron county donated the use of one of its caterpillars and that with the aid of several local men and trucks tr uck have removed the rubbish and old trees from the section to be used the old cellars a part of the homes which were removed to make this project possible have i been filled and work completed on leveling off the grounds though the project will not be started until next neit summer the work done on the grounds will provide a playground for school children and help the appearance of the street considerably incidentally some work has been done on the school grounds around the new high school building and between the sidewalk and curb and along the full length of the block bordering main street new soil has been hauled into the low place east of the dennic courts and grass planted and a sprinkling system installed the strip between the sidewalk and curb has been plowed preparatory to leveling and planting to grass the work is being done by mr garner carner and his P F r F A boys boya when this project is ig completed it t will add materially to the looks of the entire front of the school I 1 grounds by eliminating the ly patch of weeds and clover which has grown there in the past |