Show city recorder gives figures on power plant As AB there is much speculation about town as to what our power plant Is doing I 1 thought it would be interesting to the people to have some definite figures these figures are taken from the annual report of 0 the city recorder tor for the year 1929 and do not include lights and power given to the churches or needy poor RECEIPTS from dixie power co from Par city from paragonah Para gonah town what our street lights would cost at ac per KW total earnings disbursements men alen to run plant upkeep up keep on hydro electric pipe line extension work on our distributing system collecting rentals auditing collections street light globes supplies repairs at plant phone at plant 1380 bond interest sinking fund insurance on men at plant what the plant cost us in 1929 in 1934 we will start paying oft off the bonds tor for the plant one tenth each year this thi will ot of course reduce our bond interest by one tenth each year after 1934 but will not reduce our annual payments on the rhe sinking und fund in 1943 these bonds will be paid oft off richard Ric harrT benson city recorder |