Show i Spring Time Tine Road Tune Tine There will be plenty of activity activity activity ac ac- ac- ac in m Davis County this year on roads and road re re- pairs BESIDES the winter which did considerable damage to roads to many parts of the cities and county roads new roads are being built The big operation of course will be the completion of Interstate 15 1 from Pages i Lane north of Bountiful to toI I the interchange at Lagoon i and the widening of 89 from fromI Cherry Lane south to Farmington Farmington Farmington Farm- Farm I ington Junction and THE LA LATTER TIER is now under underway underway underway way and will complete a four lane highway on 89 from fromI I Uinta Junction opening up I i that past bottle neck for traffic I fic from the north and east I i through Weber Canyon Work is commencing on the frontage road from Lagoon Lagoon Lagoon La La- goon to Pages Lane It willbe will willbe willbe be completed as soon as possible possible possible pos pos- sible to help handle traffic and still be a permanent road after the completion of 1 I TIBBETT LANE will be oiled and graveled as Glovers Glovers' Lane will be closed in a few months as soon as the construction construction construction con con- of the over pass passover passover passover over 15 1 and the railroad tracks is started This over overpass overpass overpass pass will have to settle during during during dur dur- ing the winter before com corn completion completion next year With approaches and other connections that have I to do with the completion of 15 1 handling the traffic during the completion of 15 1 is going to be a problem I IF IT IS possible to keep I lone one side of old highway 91 i open along with the new frontage road during the construction construction construction con- con of 15 1 the only other j i road available for north and south traffic would be to divert divert divert di- di vert traffic over through Farmington Centerville and Bountiful past Pages Lane I Davis is County residents on the west side can go back to the theold theold theold old days when was the only road north and south Commissioner Flint says Davis County and the cities I I I will have a busy spring taking taking taking tak tak- ing care of their own roads Several miles of roads are I torn up in sewer lines in East Layton and Clinton This Thus road work will be completed with the completion completion completion com com- of the installation i I of the sewer lines I I THERE IS considerable patch work to be done in I West Bountiful Kaysville I Layton and Clearfield Many I of the larger cities have I sufficient road equipment I Ito to take care of their roads For those communities not I having sufficient equipment I for their needs Commissioner I Flint says county equipment 1 is available when called for i i While others are building and Ij I- I i I improvements on 89 j I 15 Davis County and the i cities still have miles of roads to be taken care of So if there is a chuck chuckhole chuckhole chuckhole I hole that is annoying some someplace someplace someplace place along that Jm miles les it will be taken care of just justas I I as fast as possible |