OCR Text |
Show ADVERTISEMENT NOTICE TO CONTRACTORS. Stut. ... 1 t ih, office of State Road Com- ' mission. Salt Lake City. Utah. Sealed bids will be received by tho State Road Commission of Utoh, State Capitol. Bait I-ake City, Utah, at 2 o'clock p 111 , Wednesday. September 20, 1922. and ut that time publicly opened for construction of Ogden Canyon Bridge No. 571, the .ime being a part of Project No 311 B, between Ogden and Huntsvllle. The principal Itenvs of work are ap-proximately ap-proximately as follows: Construction of One 48 Inch Skew Span Reinforced Con- , rete Girder Bridge with Reinforced Lot,, ret. Abutments anc retaining walls. Plans and specifications ari on file In the office of the State Road Commission. Salt Lake City, Utah. The above plans and specifications mav be obtained at the off he of tho stut.- Road Commission on deposting Ten ($10 00) Dollars. Any additional Information In-formation may be secured from the State Road Engineer at Salt Lake City. Utah lit to 1 Jo,. 1 on; 111 ull bids is reserved. Cash or certified check for Three Thousand Dollars (53000 00) made psy-to psy-to tin Utah Stut" Road Commission I mUSt uccompany each bid a evidence of good faith, and us a guuruntee that if 1 awarded tho contract, the bidder will execute- the contract and give bond as reouired. STATE ROAD COMMISSION B Preston G Peterson, Chairman Howard C BdeanS, State Koad Engineer |