| OCR Text |
Show NOTICE TO CONTRACTORS. Sealed bldt will be received at the of- flees of Woods & Jensen. Architects, Suite 724 l-.cclc.v Building. ")gden. 1 tah. I until noon August V 1922. for the erec-1 erec-1 tlon and completion of tho W'pbrr gym -11 11 y 1 1 1 m T'luns nnd .specifications 11111 be obt lined from the shove mentioned of -flee upon payment of S5 deposit. ESach bid must be accompanied by certified cheek fur five (6 per cent) per cenl of the total amount of the bid. Bach contractor win be required to 1 .furnish a surety boud in the amouni of I fifty if." per cent) per cent of the total amount of his bid. Bids must be sub-divided for various t portions of the work, as follows: ill I'oncrete work, plain and reinforced 1 (2) Brick work, terra cotia. tile, composition com-position floors. (3) Carpenter work, mill work, structural structur-al steels hardware light Iron work, roof and glaso (4) Oalvanlted iron and tin work. (5) Plastering. (6) Painting. iTi Blectrlcal work is) numbing (9) Heating and ventilating The board reserves the right to reject an-, or all proposals. BOARD OF EDI CATION, w BBBR NORMAL COLLEGE 961 1 |