Show DEFERS HEARING ON U U. P. P CROSSINGS SALT LANE LAKE Sept 8 11 Heal 19 19 Hear Hearing ing InA before befort the public utilities com corn commission commissIon mission on the application of or the state slate road commission sion for a de de- decision decisIon fixing the proper division of costs coals of elimination of grade crossings of the Union Pacific on the tIle proposed Emory Castle l Rock project has been continued until September 29 After attorneys and engineers for the state stale and the railroad had gone one over o the tho pro pro- proposed proposed 10 posed location in to Echo canyon Thursday the railroad representatives tives proposed an alternative lo location lo- lo location cation for one of the grade gade sep sep- They proposed an over over- overhead overhead head crossing near neal Castle Rock flock instead of or the underpass proposed by state stale and federal engineers rs about a a. mile and one half above Castle Rock flock |