Show VIADUCT PLANS BEING REDRAFTED Plans and specifications for tor the construction of the th Twenty fourth Twenty street viaduct extension are r being redrafted by data stat highway engin- engin engineers eer In Salt Lake Lak It I is believed these will be b acceptable to the state road commission It wu was wa re- re reported reported re reported ported today to the th city com corn missioners missioner by J C Brown city engineer Mr Brown attended a meeting In Salt Lake Lak on Wed Wednesday afternoon at t which the changes chancel Were discussed The Th new nw plans will call for tor steel or concrete underpinning of the structure throughout which I is demanded by the th stale stat road corn com corn mission Mayor George E BrownIng said today that the th city Is I straining itself to th the limit Urn It In participation In the th original orli plans plan and he h said RId he be could not see how bow the th city could agree aree arre to any additional cost COlt COltof of construction It is hoped he said ald that the plans plana may be b work work- worked worked ed Id out so ao the th cost will viii not be bemore bemore moro more than an originally estimated |