Show IDAHO ROAD TOI TOBE TOBE TO TOBE I BE IMPROVED I I BOIS BOISE Idaho July A 5 5 A A proJect proJect project statement covering the I he repair of the Idaho state tate high highway ay from the Fairview bridge to La the fair fairgrounds fairgrounds grounds on the tho road leading out of toward Nampa I ampa as aas Thursday filed tiled with aith Ith th the Ogden ot- ot office of office fice o of or the U S bureau burrau ot of o public rOll roads by the state slate depart depart- department department department ment If plans plana and are cd bids will be advertised for In about 30 days The Tho The proposed lude plan Include the construction of ot a layer of ot bitu tu bituminous minous concrete over o the pres pres- present present ent pavement while th the entire section Is to 1 be 0 widened to 24 feet The estimated cost coat ot of the tho project Is 1 The federal go Is to stand Eland 68 58 per perc percent percent c cent nt ot of the cost while the tho state stale will pay l 11 per Ier cent and the county 28 per cent oa |