| Show PLAN TEST TYPE PAVING I To Experiment With Layton Layton-Clearfield Highway SALT LAKE July 2 21 24 An An t ex- ex experimental project may be made of o the tho Layton Layton-Clearfield section of iho Salt Ogden Lake hIghway so that definite Information may be obtained regarding the merits ot of t concRete bituminous and the pat pat- patented pat surfaces Davis Davi county Is iq I willing to put up uthe the necessary 26 per cent of ot the needed cost coot to match federal funds prO provided the rood road Is divided Into and constructed of ot van van- ou OUd materials according to George Georger GeorgeI Georgr r I Holt a 0 member ot or the Da fiesta Das Da s county commission Tho The road commission ha has bern been notified to that effect It Is proposed to resurface two miles Ih M n concrete one mile lIh bituminous and one mile with bitu- bitu pro provided the cost coat of the he be lit lit- litter lit ter Is not In excess ot of o the bitu- bitu bituminous minous material 00 00 |