Show Are ic Ie NOW Xo Xu Under Cover Co Th The roo roofing of or the time power plant am and machine shops at th the Utah Copper COor com pany's mi mill Garfield with Ith mastic ha been heen completed complete the tue material adding no nolon not nol on only fillY I to lo their appearance hut but l being ln proof against the time elements In whatever form forni thc y ma la may ce descend said ald al Manager S. S M. M 1 L IJ of or the company by which the material immaterial Is supplied It I was added alde b by the manager that within the next ft days day the tho thC new plant with wih which the roofing roof log ing 11 I Is hi to 1 bo m n In this nock neck 01 ol the tiu tl woods WOOdA I by lH the Mantle roin- roin pan with will wl i. i be 11 In commission lon |