Show ORDER GIVEN TO REOPEN UTAH CONSOLIDATED J Pollock Special AVIre Vire Ire Boston Jan 29 Thc The execution of the loston contract late yesterday ay between th the Utah Consolidated at l an and the tho Guggenheim Gug Gug- r genheim Interests for the smelting of at t the Garfield ll ores oros of ot tw former Garl been followed b by t smelter has alrea already t orders ardors to reopen copen the mine as us rapidly 1 as possible and get Iet out the ore Or Orders ers have also been beon telegraphed to the Gar Gar- arfield ar- ar Ool field flold smelter to make immediate preparations prepay prepay- to receive anti and treat treat the ore oro In InaH rt all aH probability the ore will wl bo passing through the smelter tong long before the from tho the Utah ti first of oC March Ores Uth Con Consolidated mine do not require concentration con eon the smelter ter and are arc treated directly In Inthe Inthe ini i |