Show HAULING FREIGHT WITH STEAM I 1 locomotive during the week and aid since w i e wa was completed on thu I bot lot springs cutoff of tile the 0 L I 1 railroad the midnight freight train has been run over the new road roi drawn by a steam locomotive the peace and quiet of the citizens alone the old route has thus thug been preserved to some extent although considerable freighting has been done over the old route at the same time from all indications it will ill be but a matte of ten days or two weeks until tle new naw road will be ready for traffic and then the nuisance of the freight train operating thru main street at all times of the day and night will be ad |