| Show zuma case settled it must be gratifying to the share holders of the zuma to know that they have at last been freed from the expense and delay of a protracted lawsuit last lat monday 3 C jensen came up to eureka and met with the board of directors of the zuma mire ai d a friendly and satisfactory ar ran gement was made and the Z ma people are freed from litigation 0 and feel that they can now push the work on the property the protest in made ade aryaIn against st the patent v mill ill be with withdraw dram n and after that is done enough more of the treasury rv stock steel will be sold to continue the work which was abandon fed ed last fall it would be hard to find a property with a better or more complete equip ment the shaft house which was mas bought from the klondike mine in silver city is arranged in the most convenient manner there is a bolt hoff 35 h p hoist a three drill inger soil soll rand compressor and an elec erectile tile motor in place the gallows frame is a model and is in perfect readiness all the necessary tools burleigh drill pipe timber etc are on the premises premise s and nothing remains to be done but to put the cable on the drum and a start can be made there are three distinct veins runn ing from north to south through the six claims of the property and they are plainly traceable one by the droppings crop pings near the top of the hill to the west one in the old tunnel near the shaft and a very promising outcrop occurs in the lime close to the old goshen road on the southeast end of the property it is the in intention intention of the company when hen to aI nESb 0 yoo feet and drift southwest and northeast to cut through the veins and in all probability the zuma Zum awill will soon bradu ate from the prospect class into the producers list work will commence in n about 30 days |