Show bay may day contract at a meeting of the directors of the may day mining company held monday was author zed to proceed Eld if I 1 at once with ons with the am r lean jean smelting in I 1 kefin sip company looking to a contract for the on of its ts ores at the same s sg ss on the board r to provide the dry concentrator consent erected on its ground with the tonnage feces pary to keep it running until jan ary lat lad and it at rt the espirit on of tl at per od results result sare are satisfactorily a 4 perman tent arrangement for tl tie e milling of its ores will be n ade ads |