Show H C he henry dry we be millionaire contractor of Se seattle atties wash wait b baa cured the contract to build we ampf approaches caches j to the be great northern tunnel through the cascade mountains aaa men are already on their way to commence preliminary work henry retire refuses to state the of the cecill aoa tract it will take about elx eft montan to do we be work and then ihen every gla jag will wili be ready to commence on the track s it 19 la Is said ald will be one of tile the greatest tents in ID history hl atory the tunnel will be two ono and a ball bait malca long and will reduce the altitude of tile road 1000 feet |