Show tile tiie THE tool Toor TOOELE Lr ROAD the tha work of constructing tint ting the levee to confine the waters of the jordan within the channel of the river is sani saul to be progressing Dg auf as yet tle the overflowing has las not been curtailed ingeb and the tooele thoele road adad is 13 still innanda ted it ia is expect ed however that the water will mill be confined within proper limits in the course of a few I 1 days da T and that dry landphere land where the riad ri rt ad was will soon thereafter be bein begia in toa to a appear the rebuilding and re repairing pairin g bot bit of the highway will then be the tee next thin in order |