| Show COLUMBUS BEGINS SNIPPING SHIPPING MONDAY CIon ring Roads from Ally to toCora Cora Caro for Hauling from Columbus FIFTY MEN DIGGING OUT IRE IDE ore 0 tiN An in Or 1111 Ore Oro I to HI Shipping I I Ii expected to began IS quantities st M tIa the mine M at Mla I we tIM K aster I t A O 0 J of et the mine who who In fu Halt I lake 11 its M a ports that about N men mea and AMI 1 II tm team eOw put to work Th out tile the road mad below Tanner Hat flat As 8 then I Is about tIt Nar tt feet of kw aced alv w to be re oft oh the Spit III mile below Ute the Mat Ita k it le estimated that the be mO i will be through by to night said Hd the wad will be In shape pe for bulling by bJ M Monday morning tr J declares that It le I bl his Intention to b send 4 down from 60 10 to 76 tons toM ef at War a MY day to begin with With WithIn I In a L week or CK ten 0 days or It as oon as tho are In better ah bap shipping will lit at the ra rate of tore t tda a aday da day From the amount ot of on In sight 1 tons tOD a d day this summer ummer will make ady a sight t Impression on OD the It big g ore bob Is Ie starting earlier Ier than WM was expected The Tho management diet did not to for several weeks but It WM sou to care can for theore the theora ore ora that is Ie now At Tanners list flat nl which h le tb the end of the theto to tour mile tram tramway a from the tho mine the theora theor ora or bin bins have been Shed aIled to overflow overflowing ing At the ml mine the Ule bins blu have hae been Shed Ailed and nd the ore bins bIn below the ground have also LlIO beta bees filled ailed Already there are between IN and OM tons tone of 01 ore oat Prom From about a mile below belo Tanners Tann slat down don to Handy Bandy Ute the toads are AN In fairly goal chap ha Tit The mile of bur toad bu baa been med filled with lee ice and snow during the winter until It has hAIl been iced to the depth of tour four feet t It ItIe Ie necessary to remove this ORE tRE BODY IMPROVING air Jacobson declares that the bit big ore body recently opened up In the Columbus Columbo Consolidated property Is getting larger r than ever An yet I Its extent is Ie purely purel The theol theory no now held Is that It will ow tend teDd for feet INt As this In III of IU an avera avenge width of 10 fM feet It win wilt supply so enormous tonna tonnage The 0 ore II I Iclean dean clean throughout and I of at a high shipping The 0 ore body bod wan encountered in an upraise from a 1600 loot foot drift 0 oft the fourth level below the tunnel level It Itha hu ha been ascertained that tit the cave ave from which the sand And natel poured out Into the Ito stop wu was nn only brok broken n In InI Into to from lh the top This ore was dry and I Iel mine cars aill ot of the ore was I el close t tO I taken tout out before It stopped I pled running Jut Just how bow much more of 01 this rinse claM of nt le III not known 0 ore is III In the cavern aern The thea the roof rouf opening III declared has WOn boss to to be be entirely UP al althe Inn In Ina a rOOd good grade shipping ore The Cite mint mine seas never In better con on than It Is Ie now mid Ill Mr Jcob IOn It I to I with any th amount of ore orf that Is III In et at present A M soon anon as w we begin to tk take ore out In iii quantities there will be some great Iffat doings lit at the Columbus Consolidated The down dawn t to Tanne flat U III capable of 01 hauling 20 tons ft a aday that wore were to go day I am 18 not saying lug Ing to do that but there III ie no tel telling linK what might happen |