OCR Text |
Show LEGAL AND PROCEDURAL DOCUMENTS SECTION 1.1 ADVERTISEMENT RECEIPT OF BIDS: Sealed Bids on forms included in these Bid Documents will be received at the office of the Davis County Flood Control located at ,j 28 East State, Farmington, Utah ! (Davis County Courthouse) until 1:45 I p.m. (local time) on July 18, 1988 for the restoration and slope stabilization of North Canyon Creek in Bountiful, Utah. OPENING OF BIDS: Bids will be opened at 1:45 p.m. on July 18, 1988 (local time) in the Chambers of the ' Davis County Commissioners. BID DOCUMENTS: Drawings, Specifications Spe-cifications and other Contract Documents Docu-ments may be obtained from Palmer Wilding Consulting Engineers, 405 S. 100 West, Bountiful, Utah after July 5, 1988 upon payment of $50.00 per set; non-refundable. The payment shall be in check form and be drawn payable to Davis County Flood Control. SITE SHOWING: On July 15, 1988, there will be a field review of the project pro-ject site. All Bidders wishing to attend, should meet at the office of Palmer-Wilding Palmer-Wilding Consulting Engineers, 405 S. 100 West, Bountiful, Utah at 10:00 a.m. PROJECT DESCRIPTION: The project pro-ject will involve the stabilization of ' approximately 800 lineal feet of North Canyon Creek through a residential area and construction of a concrete outlet structure. Major items of work consist of: Stream Channel Excavation Riprap Armoring Debris Basin Outlet Structure The project is located on the east " bench of Bountiful, Utah, beginning at j Bountiful Boulevard (approx. 900 East) continuing southeast between i Canyon Creek Drive and Indian Springs Road (approx. 3550 South). DAVIS COUNTY FLOOD CONTROL & PUBLIC WORKS Published in the Davis County Clipper First publication June 22, 1988 Last publication July 6, 1988 Issue No. 20 C-340 |