Show GREAT fALLS FULLS OUT OF DANGER Flood Waters from Hauser Lake Dam Passing Point Without In Inflicting Much Damage NO TO THE SMELTER Work orl of Ir I tIme the Dam nl Hits Al Already 1 ready Situation at nt 11 Is Serious Helena Heen April A special to th the Record front from trl Falls Puls says that th time the Hood waters from Hauser Lako dan dam avo ao i cached unit and I It are Uro passim that tha point without Inflicting tiny any un great dam damn age ngu nAU the tho of th tH river proved of dent clent size ic to carry cairy the tho flow 1101 quite sat t Tho water ro roce e to l LI height no grouter greater tian than luring during the oils cut els spring Hoods This is 18 nc tIe acc counted c for by the taCt fact that time tho th low lying lands Ian ls between Cascade am and Groat Gnat Falls Fails have served as its 15 reservoirs reservoir antI and thus lessened the danger lr III In that Out city General Manage 1 Goodalle Goo lle o ot of ottil thc til Region Montana company Is nu au for tile the statement ent that time tho large smelting plant nt will wil suffer stiffer ab Hood no Injury as a a result of lr f time tho loo SITUATION AT I CRAIG CHAI The lIme situation at It Chils Is one ono of great grea seriousness Tho debacle has hall result resulted ed cd In the time practical destruction Dt t r th the town its Is lOU or 0 Inhabitant have formed a temporary refuse refuge e 01 01 on one of or the time hillsides The Time women nm and children have hao been boen furnished hec ado ade guam It I accommodations in cabins while tha th men immen have havo been forced to sleep In improvised tents With the exception l of tho time school house huu e practically every Ins u uthe 1 mu the tim town hl has ia been bien destroyed 01 or 01 so clogged with wih debris that It can cani i niL INt l be he occupied and amid the tho contents Ono One small email smal residence has clog clogged 1101 god ged the entrance to t the tho Great Grent North cm crim tunnel below life t town toI The Time rail ral railroad road roid Is ii torn toni up lp for stretches of mies in length It 1 Js Is Impossible to estimate tho the loss to many mun of u whose herds and buildings lm hi hay stacks and the tho th like le were washed away awa REPAIRING THE filE rIE DAM Already time the work of repairing time the dam has begun Material and debris formed an in a im impromptu damn dam a I shor distance below lake site sie am this will wil be forced forcel out oUi so BO that sur sum surveys veys CS may be made lade of ot tho time structure General Manager Gerry Gero Gerl that the tho structure can bo be repaired In six milK months at nt a I cost of 2000 Tho The machinery In the power powel house Is im covered with sIlts silt l but bu buIt It it is to hav sustained no oilier I v t It Il is being dand and put into shape sl a 11 |