OCR Text |
Show XOT1CH TO W A T 10 R t.'HKK.S Stale Engineer's! Office, Hall i.ak'. City, Hall. Sept. It, 11)21. Notice in hereby given that tin; Dixie Power Company, wliiif! princi-pal princi-pal place of Imsiiifss is St. GcorRO, Washington Counly, I'lah, lias made application ill accordance with the requirements of III': Compiled Laws jf 1 'tali , 1!) 1 7, as amended by till Session Laws of l-tali, l<t, to appropriate a c. f. s. of water from Chadhurn Warm Springs in Washington Wash-ington County, llali. Said water will he diverted al a. point S. 2S 4 1' W I 7 a!) reel, from the X 10 Corner of See. I), T. 40 S., R. Ki W., S. L. M. This waler is to he taken from its present channel and lifted by means id' a 75 11. 1'. Motor and a DeLaval Rump against a heail of 127 feet and di:. i -barged into tin; Rower Company's present ditch in which it will be conveyed con-veyed a distance of about 15,0(10 ft. anil there used us a supplementary supply to application No. CS15 from Jan. i to Dec. 31 of each year for the purpose of electric lighting in the summer and for the purpose of thawing thaw-ing ice in the winter in Washington and Iron Counties. After having been so used the. water will lie returned return-ed lo the natural channel al a point X 22" 19' 10. 734 ft. from K 14 Cor. Sec. 1 1, T. 40 S., li. 17 W., S. L. M. This application is designated in the Stale lOngineer's Office as File No. 'J 5 2 0. All protests against the granting of said application, stating the reasons rea-sons therefor, must be by affidavit in duplicate, accompanied with a fee of $l.oo, and filed in this office within with-in thirty (30) days after the completion com-pletion of the publication of this notice. LLOYD GARRISON, State Engineer. Dale of first publication Sept. IS, 1921. Date of completion of publication publi-cation Oct. 1G, 1924. |