Show Work to Start StartOn StartOn StartOn On New City 20 Water Line LineA A bottleneck In Vernal City's water Is In fie tue pr of being solved by the lie awarding of a contract for three and one-half one miles mile J of 2 Inch 23 line tine to V. W. C C. C James Inc tar far June 1 15 THE NEW Inch 20 steel with comet t t coating water line will wll v ll begin near this Leo Lea Hacking residence and continue up Dry Fork Canyon one mile above the plant In Merkley Park to connect with a 20 inch 20 inch line built some years ago The present line is only 16 10 inches and lacks the capacity to supply high demand periods In the summer The water main branches to two lines at the Hacking corner thus causing the Inch 16 line to act as a bottleneck PART OF the bottleneck line was uncovered un un- uncovered covered by the recent flooding of Ashley Creek into the Highline canal This experience experience ex ex- caused engineers to change the already surveyed route of the line and place it above the Highline and Ashley Upper canals preventing future hazards of washing out in the sandy area The James contract included only the construction in Inlaying laying the pipe The pipe will cost over and with the costs of values and arid way rights y the mile waterline will probably cost Vernal CIty City Ci ty or or inor more explained Buell Bennett Bennett Ben Ben- nett city manager Si- Si The s city ty will borrow the money to finance finance finance fin fin- ance this important water supply pro pro- |