Show SPLIT MOUNTAIN PROJECT A. A E. E Humphreys and J J. J H. H Ratliff and Mary l E. E Ratliff have applied to the federal power commission for fora a preliminary permit for a 0 proposed power and irrigation project to be located at alt the split mountain site In Green river The applicants propose propose pro pro- pose ose to build a 16 O foot da dam l to develop develop develop de de- de- de horsepower power for use in manufacturing fertilizer from adjacent adjacent adja adja- cent phosphate beds heds and for far supplying supplying supplying supply supply- ing light and and power to Ito the small nearby communities Two Irrigation canals are proposed one leading from either side of the dam to irrigate gate gatea a total of about acres a 0 o |