OCR Text |
Show FLOOD CONTROL CAMP CAMPMAY CAMPMAY MAY BE ABANDONED ABANDONEDNumber Number of C . C . C . Units in inUtah inUtah inUtah Utah Red Reduced uce from from36 36 to 25 . Hard on the heels of official notifi notifl- notifl notifi- notiflcation notification notification - - cation that the president had approved approvedthe approvedthe approvedthe the assignment to Utah of 14 of the thecIVllian thecivilian thecivilian cIVllian civilian conservation corps camps to tolocatIOns tolocations tolocations locatIOns on state lands where it was wasplanned wasplanned wasplanned planned to utilize them for flood con- con control control con control - trol came a telegram from Washing Washing- Washington Washington Washington - ton Friday restricting the total num num- number number number - ber of camps assigned to Utah to 25 25The 25The 25The The original allotment was 22 forest forest6ervlce forestservice forestservice 6ervlce service camps and then the 14 camps campson campson campson on state landsThe landsThe lands landsThe The new orders , it is felt , will cause causethe causethe causethe the abandonment of the proposed proposedcamp proposedcamp proposedcamp camp at Moab , where tentative plans planswere planswere were \ ere under way to establish establlSh a camp campfor campfor campfor for flood floodand ' -and and 'and - erosion control along alongMlIl alongMill alongMill MlIl Mill and Pack creeksThe creeksThe creeks creeksThe The telegram received receiv.ed . from Wash Wash- Washington Washington Washington - ington further stated thatcamps that -camps camps 'campsomitted campsomitted ' - camps campsomitted . omItted necessarily as a result of the thereduction thereduction thereduction reduction w would uld be given consideration considerationfor for fall work , when it would be Inad inad- inadvisable inadvisable Inadvisable - visable , on account of weather ancr and ancrother and"other andother " ' other conditions , to continue to maintain main main- maintam maintain - tain tam camps at high altitudes altitudesA A conference was held by state and andforest andforest andforest forest service serVlce officials offlcials following followmg re- re receipt receipt re receipt - ceipt of the revised orders from Wash Wash"Ington WashIngton " . : ' in ington gton , and it was decided that thEt the thEtforest theforest theforest forest service , which received its itsauthonzatlon itsauthorization itsauthorization authonzatlon authorization for Utah camps some sometIme sometime sometime tIme ago , had aheady alleady proceeded so farthat far fairthat " ' that it would be inadvisable inadvlsable to dlSturb disturb dlSturbits disturbits disturbits its plans materially matenaUy For the present presenttherefore , therefore , and with the peak of sum sum- summer summer summer - mer approaching , the camps In the- the thenatIOnal thenational the-national the national - - natIOnal forests will go ahead about as asplanned asplanned asplanned planned . With 20 forest camps scheduled scheduled.there scheduledthere . , there will w111 be left five camps for the thestate thestate thestate state . These will w111 be placed at the thepoints thepoints thepoints points where the need appears greatest greatest.and greatestand . , and where work can be best prosecuted prosecutedIn In the meantime , the plans for the thefuture thefuture thefuture future Vr work ark in the forest camps will willbe willbe willbe be so altered that the men from these thesecamps thesecamps thesecamps camps will be available for work in inother inother inother other locations on state or privatelyowned pr1vatety privately pr1vatetyowned privatelyowned owned lands as 'as ' unseasonable weathel weather weathelmay weathermay weathelmay may drive them from their locations locationshigh locationshigh locationshigh high in the forests In this manner manner.it mannerit . , . it was thought , a maximum of work workbe workwill workwill ' . will be possible under the new regula reguIa- reguIa regula- reguIations regulations regulations - - tions in both forest and flood controlwork controlworkIn control controlwork controlwork work workIn In the event that the Moab flood floodcontrol floodcontrol floodcontrol control camp is -abandoned abandoned isabandoned - - , as appears appearsl1k.ely appearslikely appearslikely l1k.ely l1kely likely . for the present , at least , , it is isthought isthought Isthought thought that the remaining rcmammg men en- en enrolled enrolled en enrolled - rolled and selected from , this county countyfor count ; for 0 C . C C woik wOlk work will wUl be attached to tothe tothe tothe the forest camp at ' Wamer 'Varner Varner Warner ranger rangerstation rangerstation rangerstation rangerstationIt station stationIt It no now " appears quite sure that some someflood someflood someflood flood and erosion work will be done in inMoab inMoab inMoab Moab valley , and there is 18 every reason reasonto reasonto . to believe beUeve that a winter camp will be beestablisned beestablisned beestablisned establisned for that purpose purposeThecrew . -Thecrew Thecrew - 1'he 1he The 1'hecrew Thecrew ' crew fiom flom from Warner Waruer foiest Iciest 101 est camp may DO 50 50moved DOmoved bomoved moved down into the valley when falL falLweather fallweather fallweather weather renders the forest camp iD1- iD1 im- im - iD1placticable impracticable im-piacticable im piacticable - placticable practicable |