Show SEWER CONTRACT MAY BE GIVEN TO CHICAGO BIDDERS Largest Job Ever Awarded Here to Cost Cosi Over Three- Three quarters of a Million Indications iro that the tho biggest single 1 le ever aar awarded od in Salt Lako Lake City will m be awarded to Hent Henry C. C Then Ulen tomorrow tomorrow tomorrow tomor tomor- row morning when Wh-cn the city commission Will Trill formally lorman let kt the contract for the con con- con con- of or setter extension No S. S Tho The lIewer extension t embraces that tha t territory 5 b between tw n Ninth and Thirteenth South and Seventh West and Sixteenth South h The cost 0 of tho the exten exten- sion ion will be bo about H OOOO JUg Big ig Extension Cn Bids md on tho tim new nev extension were t opened opened b by tho the city commission this mornIn morn morn- ing In The bids bide wore were referred to thc tho city anJin engineer er for tabulation anti will wl probably probably ably bl b bo be returned to tho the commission to tomorrow to- to morrow morro morning with Ith the recommendation tion that the be awarded to tho the lowest hiJ bidder Jer 4 hJ It ll Is not absolutely certain the tho Indications indication are th that t tho the Chicago o contractor con cOn- tractor Is ls tWo thc low bidder Four Cont contractors contract ct ors ore submitted bids including the Chicago man mall P. P J. J Moran G. G A. A Heman and James Kennedy ennedy Th The bid of or Mr Ulen on the excavations vat Jons and backfilling was vas much owel oel than that of ot tn the tho Utah contractors 1 5 Its 1 ls bt hId for r thiR part of or the wk work alone was as i II lower limb that of or the tho 10 lowest Utah contractor on tractor Bids Arc Opened The man however Is higher hiher than tho the Utah contractors on SOmo of or tho the items of ff the the- contract It is doubtful however cr whether r that difference will be bo to or offset tho the difference In the bid a for or excavation and backfilling Each of the bids opened this morn morning hI was t accompanIed accompanied ac ac- ac- ac companied by a certified check for I OO The Thc ne now new extension will add Abt- Abt sixty seven en e miles of or sewer to the Salt Lake system or Third ont as much as has already been Installed by br the city city- t At tho the present the sewer system stem embraces 1ST miles of or piri According to th the preliminary es cs- cs of or the elt city engineer the thc work worl will wll cot cost approximately The en engineers engineer's en- en estimate Is a little more than a third of or the entire amount If spent nt b by Salt Lake City for sewer Improvements ments up to I January L j. 1914 |