Show Oil Situation I Is Not Changed Th The Utah Oil Refining company ge geologists go- go report that the smaller casing to 10 be run at the Vernal test to shut off the gas flow which Is blowing at the rate of cubic feet a day is again being run down the hole on th the Ashley valley test The new packer ha has arrived and H 31 will take about two days to get the casing try out the packer and If It works th the cementing job will take several days As soon as the gas Is shut off the hole will ba be drilled down to a lower sand where It ItIs Itis is hoped an oil formation will be tapped The Cisco situation remains un Un- Un changed At Gebo Wyoming the hole Is Isnow isnow now down 1400 feet and another string of casing Is being lowered preparatory to drilling into int a sand where production production tion Is expected At Black Mountain Wyoming there I Is practically no change No 2 well has been completed an estimated production of between and BOO barrels of oil it a. day At Big Piney the drilling Is at feet with the bus bits still above the Frontier sands where It ItIs Is Ia expected production will be had The test of th the Midwest Refining company corn com pany at Moab has been in in it 1 i reported and Is now down between and feet Operations in th the San Juan Yuah field are again under way Machinery and equipment Is being moved Into th the VIntah Uintah basin for the test about eight anti and one half miles mile from the Ashley v l- l Icy ley test on a different structure The test Is being put down by private Individuals Indi although it was stated at th the Utah Oil Refining that that company may go In ill and give financial assistance for the test |