Show PARLEYS PARLEY'S P CANYON DETOUR EXPENSIVE Th The suggested detour into Parleys Parley's canyon on n-on as a substitute tor for the proposed bridge bridge- across the canyon canon mouth as a means mune of linking the two extents of the Wasatch-Bonneville Wasatch boulevard ud Is la not as a. economical or practicable as aa first estimated esti esti- i mated but would coat cost accordIng according accord- accord In Ing to figures laid before the board of c county commissioners yesterday by bi- bien en engineers en- en of ot the count county surveyors surveyor's office I IThe The bridge at the mouth of the canyon I would have hare to be built eventually to get gete e 11 stet u un 1 v results the engineers fn say Kay |