OCR Text |
Show STARTS A TRAIN. t'ntll the railroad Is built and completed com-pleted this year, ore from Nevada TVug-laa TVug-laa will be shipped by means of a traction trac-tion engine and a long train of cars to the nearest railroad The engine and train arrived recently at the property, and will be utlliied in hauling ore at once. The capacity of the train Is about fifty-five fifty-five tons of ore. and remarkably fast time can be made. Large shipments will soon be made by means of the train, which will travel from Yerington to Wabuska. |