OCR Text |
Show INTERN WILL ASK GRADING BIDS Work on the Salt Lake Utah Valley, the electric Intemrben line that will connect Salt Lake City and Person, is being; pushed with all possible epaed. according ac-cording to the announcement made this morning by W. E Orem. president of the road. At the preeenttime nearly 100 men and teama are at work grading and track laying on Academy avenue Tn Provo. A large force of men arc engaged In builds Ing concrete conduit In the Jordan narrows nar-rows and within a week the I'tah Construction Con-struction company will have thirty carloads car-loads of equipment In the narrows reedy to commence the grading of that part of the road, which le bv far th heart eat place of work that the company all 1st re to do. Within the nest weak contract for the trading of the road from th narrows to ahl will be let and work la n pec ted to ..mmence on that part of the road within tha next ten days. All ef the material for the road Is now on the ground and It le expected that tlie road will be In operation between Malt I sake City and Provo by October 1 next. |