| Show GOuT l MIt 11 ISay Gold Are Three care car of at ore oro reached town to today day from the lay 1 ay of ThIs Is the first shipment thIs year er and since the new hol hoist t was installed A report from the mine states that In OM on place In the workings the percentage of If load lead Is less willie whIle the values are from toni one ot of the thc care CAn of oC th present ted nR Its hIgh II as l 1 ounces in III gold goldat It at tilt the mIne While It Is not thought th that th the average will run rull that high it itIs itis Is expected the wili VIII show a higher average In the yellow rellow metal than any previous shipment |