| OCR Text |
Show Water Commission to Get Report on ; Moon Lake Plans Th report of tha bureau of reclamation on tha pronoee-d Moon lake project will b given to th water storage' commlaalon at lis regular meeting; Wednesday, Oeorse M. Bacon, atat engineer, sviid Tuesday. Representatives from th Moon lake region in tho Uintah, basin will attend th meeting. Investigations on tha proposed project bar beon going on for several years under tha direction of IC O. Larson, engineer In charge of Investlgstlons for tha reclamation servlc. in Utah. An economic survey of th. project will b. necessary before th. reclamation bureau will considsr It. Water users will determine whether or not they want such a survey after they learn th. engineering; costs of th. project. If an economla survey Is called for It will b. mad. under th. direction of W. J. Johnson, John-son, economist for th. reclamation bureau with headquarters In Denver. |