| OCR Text |
Show Deficit Allowd for Paving at Capitol Mulllna A Wheeler of Salt Lake were low bidders Mondsy on the construction of a west entrance to the capltol grounda and a walk to th. west door. Th. coat of the work will be 111.174. Th. atat. board Of axamlnera. In a special meeting Monday, allowed a deficit In the state highway fund to take car. of this work and to - HAM Amttit fn tha m.lfl paving work. The appropriation for th. paving waa 150.000, but a revision re-vision In the capitol drainage eya-tem. eya-tem. not In the original estimate, added S4000 to th. cost, bringing th. total cost up to im.OOO. |