OCR Text |
Show PAVING OF BRIGHAM STREET IS URGED A petition, signed by about one-half of the property-owners on East South Temple Tem-ple street, asking that the street be paved from State to Eighth East street, will probably be presented to the City Council at its ne,xt meeting. The matter has been brought to the attention at-tention of City Engineer Kelsey. who estimates es-timates in a general way that the paving will cost close to $150,000. Owing to the peculiar grade of the street-as far as E street, one or, two retaining walls will have to be built in the center of the street to that point. The petition asks for asphalt pavement similar to that on other streets of the city. |