Show LEAD KING INC tEASERS LEASERS HAVE TWENTY FIVE TONS INS OF ORE LOADED LADE of or ton shipment Another nother tw lw high grade Sade I lead ad ore Is o being brought down from the Lead King ICing mines and will be loaded some da day this week 1 to to be sent lent to one of the In In Salt Lake vale valley The fhe oro ore was 98 Produced produced pro Pro- workIng workIng workIng work- work b by leasers w who o have been Ing the he property for foT T some t time e and Is expected to lo be worth woith about 50 60 a 0 ton brothers Alphonso Al- Al The he leasers are arc three phonso Louis and l alt all al aln n natives U es of ot France where they ed the occupation of coal coal miners says s Ely Exposi Expositor tor The The Lead Led Ring King company Is 15 a a cOS close few tew Snit Salt corporation controlled b by bI a Lake business men who have havo done continuous con con- development work for five t o or six years year Considerable ore ore was wasi produce produced produced pro pro- and shipped chipped In tho la last Ian t couple duce of dead while largo large amount of ot years a ers n owns a fl work was done The company lar large e group of claims on which fine surface Indications are numerous On the north end of the group a a tunnel feet teet to prospect for tor toran foran was driven t an wa ore bo body found at a. a a higher elevation and from fron which shipments were nade ant The Tue tunnel l 1 l I Is In the black lime but was stopped before It reached the white lime In which the ore occurs From a tunnel higher up the mountain mountain moun moun- tam tain shipments of ore were mined and sent to the smelter The ore occurs partly In tho the lime and partly In loose sand and galena boulders found In a abig abig abig sane big crevice This bulder crevice cre was followed down from the surface for or a considerable distance before the tunnel 1 tapped it I at greater depth and from roni the tunnel was followed t down In iii a n until It ended ende It Is believed d that It will willbe willbo wi In a 0 big c cave cI I It I bo be found round below the cave but on a account of of ot the formation at a displacement about the point where the cave was found further exploration was waR postponed until lower tun- tun the crevice can cnn be cut b by the net nel V The erler earlier Ii workings on 01 th the Lead King i group roup Te were wor on tho the North Star claims on both of which shipping chipping ore was vas f found close to the thc surface One of the earlest earliest coe shipments from the property rrIe carried more than SO 80 per cent lead led according to the on 11 it I by the c A. A R. R and R. R R company On tho the Morning lorning Star a long tunnel has been driven that has numerous short branches and slopes from alt all al of ot which good ore has been mined Alo AIo from an mine incline o In the tunnel the ore streak was followed down considerable dl distance tance until It narrowed up It I Is Ie very pro probable able the he streak I will be bo found to widen again below elow the bottom wi of ot the tho when hen furher rU fur fur- her prospecting Is done there A A. shaft shutt on the North Star was WeS the source of ot good ore that was waR shipped from th he the property Ioa at different times The Tho ore appeared to cut off however and no worK ork was as done In the shaft for tor a 0 long time Recent explorations disclosed the fact ton that hat tha but a thin shell elicit of rock separated the tho theold old Id workings from a 0 big deposit of loose ore ro estimated to contain thousands of ot ottona tons tona ona While It is i nol not grade de as asIt ast It t can be mined It Il contains contain lots iota of oro ore that hat ban tran an be sor sorted l up to shipping values alues 1 A surprising feature regarding this ore ores Is s that a sample recently taken and e a es essayed sayed ed carried In gold Kold The assay ran low iov ow In lead for the tho r reason that H pieces of f galena galeria were picked pike out of the tho te sample as s the desire was to learn lear If It the barren looking rock carried crie an any values A large ack fack of or the ore has hi been shipped chipped to Salt Sal of ot making further Lake ake for tIm the purpose tests test Meanwhile Meanwhile- t a the leasers will wi resume reume work In both th the North Star and Morning MorningStar Star tar after they have he attended to the shipment of their car of ore The he Lead King group Is 18 situated on the theop top op and on the east enst slope of the tho Dutch creek reek range directly east easl of ut the north end endt endo o t the McGill smelting plant and Is oc reached etched by the road rad that runs up the main canyon an on cast east of ot the big tacks stacks It I Is a limb climb of about 2000 WOO feet In a milo mie to the theop top op of ot the range and ami part of or the road Is 18 Iso isso so o steep te p that the thA oro has to lo be bru brought ht down own on a vehicle that Is half hll wagon and halt half alf drag The Te front wheels and running gear ear of oC a wagon ere are used and the dr drag Is constructed d of ot poles about twelve feet teet long ong and ten Inches In diameter at tho large arge end Two and a half haIr tons are brought rought down on a trip and as to lo the tho eye eye yc part of ot the grades appear apper to bo all allf al ot of f 45 46 degrees a strong team leam of horses horle Is needed neede to 10 guide the load down them Theore Theore The Tho Thore ore re Is dragged to a point In tho the canyon which Is II still etl a hl higher her elevation than tho the top op of ot the tho foot reverb stack and there unloaded to be hauled haulE on four wheels 18 to toI the he car on which It will wi 1 b bo sent to Salt I Lake ake |