Show Highway Bureau Calls for foi Bids on Subway Project Pocatello Tunnel Expected to Cost to toBe toBe Be Finished Oct 15 I BOISE Idaho The P P The bureau bireau of hIghways advertised Wednesday for forbids for forbids bids ids on constructing the subway Under un un- der cr the Oregon Short Line railroad tracks racks in Pocatello the bids to be opened here April 13 The job is estimated to cost 00 to The subway will be feet long of f which the barrel or tunnel Under under uner un- un der er the tracks is the greater part extending ex ex- tending lending more than feet The concrete bore will provide a foot 0 roadway with two six loot sidewalks on eIther cither side replacing the he present viaduct on Center street which spans the tracks to carry old Oregon trail and Yellowstone highway highway high high- way traffic as well weIl as troT troT- I f Ic ic Terms of the contract will require I completion not later than October 15 5 It is one of oC the largest single highway jobs to be undertaken by bythe by bythe the he state in recent years |