Show S. S wafer Waler Project 7 Talks Held In Utah Ufah County r rr r r ram Leased Wire Ire PROVO Oct A 29 29 A landowners landowner's t committee for a special flood cons conr con con- s r hol project on the Spanish Fork Forke e river met Friday with Utah county C commissioners and U U. S S. army en engineers engineers en- en to determine the county's county responsibility in the scheduled project County commissioners agreed t to toz z replace county roads and bridges bridge that might be damaged or in need T to be changed chang as a result of th the work which will be carried on by bj army engineers after congress makes an appropriation for the work Complete cost of the flood control con con- rol work is estimated at and will include dredging am and anda II a Straightening work on all land adjacent to the Spanish Fork riverA river A A severe flood in 1944 covered am and damaged lands from the mouth of Spanish Fork canyon to the lake Army engineers made a survey I of necessary work and will go ahead with the project as soon as asS funds from congress arc are received S Committee members meeting with commissioners include Harold Harold Harold Har- Har old Creer Allen Ray Raj Finch A A. A T. T Banks and J J. J A. A Nelson Nelson Nel- Nel Ison son all of Spanish Fork landowner landowner landowner land- land owner committee members and andI I Frederick Cronholm U. U S. S army engineer and Thomas Jensen Utah water and power board both of Salt Lake City 41 Also meeting with county com corn commissioners commissioners missioners Friday was a delegation delegation delegation tion from American Fork which requested graveling about two miles of road south from the American Fork tabernacle and asked the county commission to petition with the school board the railroad to install signals at three crossings south of Provo Pro |