| Show OIL COMPANY MAKES MANAGEMENT SHIFT Changes Cage in the te management of the Cane Cne Creek Oil 01 company drillIng drilling drill drill- drU- drU Ing a test well wel on the Colorado river 12 1 miles mie below Moab oab were announced announced announced an an- Saturday at the company offices in Salt Lake City T. T A. A A Collins of ot Los Ls Angeles for tor many years general generl field superintendent superintendent of the Pan-American Pan Petroleum Pe Pt- company has been appointed appointed appointed ap ap- ap- ap pointed drilling superintendent succeeding succeeding suc suc- Max a of ot Moab oab C. C C. C C Morgan orn of ot Los Ls Angeles has ha resigned as a vice president and Is Isnow isnow i now organizing a new company to drill on acreage offsetting the Cane Cne Creek No 1 well He Is I succeeded by J. J H. H H McGibbeny of ot Salt St Lake City trade executive commission secretary of the te Utah The well wel Is I bottomed at 1637 feet tee the objective being the te Cane Cne Creek gusher sand sd at about 2025 feet teet Mr Collins has moved In with wit a crew of ot his own men made some changes in equipment and expects to complete the te well wel and ad make a test some time next nex month mont |