| Show SCHOOLS FIXED FOR OPENING With the rin ringing ing 0 or bells only a few days awa away all build buildIngs Jogs Ings and grounds in the th Salt Lak Lak school district have been mad ma made f sate safe and healthful in an extensive e program carried on durin e summer Bummer Dr L. L John r. r superintendent of ot school sald Monday 4 Major project during the summer summer summer sum sum- t mer was the remodeling of the theJa Ja Jackson school which Included re re- removal naval moval of an old wood stairway replacing it with a fireproof concrete concrete concrete con con- crete in another location location location loca loca- tion modernizing of the heating healing and ventilating system and Installation in installation In- In of ot a new lighting system system tem tern in the corridors Riverside and the rear building of the Sumner schools have ha been brick stained and have he had alt aIt their exterior trim painted d while Highland Park and Webster have had all exterior trim painted and interior painting done The major portion of ot the Interior surfaces have been painted d dat at the West Vest high Garfield One- One qua Lincoln Longfellow Ri J r cr- cr side and Roosevelt schools Playgrounds at the Irving Do Douglas Doug Doug- glas g- g las Forest Garfield Hawthorne and Riverside schools have b been en oiled In addition all playground surfaces surfaces surfaces sur sur- faces have been cleaned and put In good condition improved lightIng lighting lighting light light- ing has teen been provided in many classrooms all boilers have been b ri overhauled and put In good dilion and desk tops in approXImately approximately half of the schools have been resurfaced Dr Nuttall said |