| Show FORT DOUGLAS PROJECT APPROVED A W P A project on the Fort Douglas reservation will start within fen ten days days' Darrel J. J Greenwell state W P A administrator said Thursday upon word from Washington Washington Washington Wash Wash- ington D. D C C. that President Roosevelt Roosevelt Roosevelt Roose Roose- velt h had d approved ved the project The project calls for widening and construction of a road along the reservation boundary construction i of two miles of concrete guttering i and grading and graveling of the parade grounds rounds feet north from Fifth South street and feet west from Wasatch boulevard |