Show I A Additional Mining M and Financial News HOIST INSTALLED AT WALKER MINE Installation of a new now dru drum i hoist Has tw been completed by th the Walker Mining company and ald th the hoist is now in operation according to reports from Ca CaThe Cat CaL The hoist hoist which Is Installed on th the level tho the main tunnel level is i reputed to be the tho largest in Call Call- fornia The company also has completed operations and Umber timber repairs is and beginning ng extensive development of ot ore oro bodies in th the north end of the property First Firs to be developed will be t the e downward downward down down- ward cx extension of the north or ore body This has been worked ou out above the tunnel level below the tunnel level el is an ore body of unde size containing an average of 31 34 per cent cent- copper It has bas already already already al al- al- al ready been developed by a raise from rom a n northward drift on tho the 90 level evel This r raise ise will be with the levels nb above vc and below bya by bya a from the and a amie raise mise from the 1000 From the b bottom of the connection ion Uon the company will drift north about feet on the 1000 level to tap tp the a and Piute ore bodies s. s The comp company ni plans plans alSo also alo to sink ink the he shaft an additional roo feet to explore the downward extensions ns of the he m main ln an and south ore e bodies |