Show SUNSET WATER WORKS PUSHED SUNSET Work SUNSET Work on a new Water system Is advancing rapidly according to LeRoy LoRby B. B Smith presIdent president president pres pres- ident of the town board With the trenches already finished finished finished fin fin- a large crew of local workmen workmen work work- men are arc now laying the pipe The Th general contract is let to EnocH Smith Salt Lake City contractor When completed the project will Include more than three miles mUes of ot pipe Of this amount approximately one and three-quarters three miles mUes along the state be composed of inch four cast iron pipe while the laterals on streets running east and west will be of smaller size Present plans call for tor the con con- of a reservoir at a a. point west of the Sunset church to supply water vater for the new system A A. g flowing 35 gallons per minute the year around is situated here and will be used to keep the reservoir full Mr Smith said The waterworks project is b bring being constructed under a federal grant an and will supply approximately app 50 homes with culinary water |