Show Y to Get Building for Athletes Long-Felt Long Need to Be Answered PROVO Feb 7 7 Plans Plans are under way for construction of a at the tile Brigham Young university stadium which will contain contain con con- tam tain shower rooms lavatories lockers dressing rooms and first aid aid rooms President Franklin S. S Harris announced Friday The building a long story one-story concrete concrete concrete con con- crete structure will fill fiu fill a long-felt long need President Harris said Part of tho the ex excavation has already been done and it is hoped the building will be finished in time for use when the Brigham Young university university university sity opens next fall It is planned to erect the structure structure ture turo parallel to the running track on tho the west side of tho the gridiron opposite the tho present seating sections sections sec see on the tho hillside Tho The building would form torm the basis for tor bleachers when additional seating capacity is ia needed on that side aide Joseph NelBon Nel- Nel eon Bon local architect Coach G. G Ott Romney Professor C. C J. J Hart and other members of tho the physical education education edu edu- cation staff are arc at work on plans It is believed the new building will prove a n. great stimulus to mass participation in athletics at the university university uni uni- officials s saId Id ity fly to dressing and shower rooms of tho present stadium has proved a decided drawback as far as students Btu stu stu- stu dents participating in intramural I athletics Is concerned they said Showers lockers and dressing rooms for both men and women will be provided in the building Intercollegiate athletics aro arc also expected to benefit Visiting teams mu must t dress at ct the mens men's gymnasium several blocks from the field and the local team must dress and shower show show- er about a a. half mile mUe from the sta ata- ata di 0 1 |