Type | issue |
Date | 1932-07-20 |
Paper | Salt Lake Telegram |
Language | eng |
City | Salt Lake City |
County | Salt Lake |
Rights | No Copyright - United States (NoC-US) |
Publisher | Digitized by J. Willard Marriott Library, University of Utah |
ARK | ark:/87278/s6jq2817 |
Reference URL | https://newspapers.lib.utah.edu/ark:/87278/s6jq2817 |
Article Title | Strawberry Water Schedule Planned |
Type | article |
Date | 1932-07-20 |
Paper | Salt Lake Telegram |
Language | eng |
City | Salt Lake City |
County | Salt Lake |
Page | 6 |
OCR Text | Strawberry Water Sched Schedule le Planned George M. M Bacon state engineer was as in Spanish Fork Tuesday to discuss dis cuss with officials of that city a new schedule of at water withdrawals from the Strawberry reservoir Because of the large number of water users demanding water at the same time last summer considerable difficulty resulted he explained With Witha a proper delivery delvery schedule he said 85 per cent of the contracts for tor water from the r reservoir can be filled without without without with with- out trouble |
Reference URL | https://newspapers.lib.utah.edu/ark:/87278/s6jq2817/16149533 |