Show Rio Tinto's First Car at Sampler The initial s shipment from the Rio Ro unto Tinto tinto mine mie at Mount Mountain in City north of Elko New Nc reached Salt Sal Lake Tuesday and was switched at once to the thc sampler ampler The load consisted of 50 tons of copper sulphides sulphide from the bedded deposit copper encountered at the foot level level From the foot toot of at the shaft shaf the company company com pan pany has driven 45 feet west and 18 feet east cast In ore that may run rn as a high as 40 per cent copper Returns on the car will vill wH tell the story stor The Rio Tinto has ha several hundred tons on its it stock stok pile pie and a fleet feet of trucks to haul the ore to Elko |