Show fay layor or Doubtful lf tf Final Benefit in En n Water Saving Study tudy Program Care- Care illY Before Giving It to Commission Not Wat ot Seen Scheme Given keh of Committees I doubt as to the thc ulti- ulti 1 that will ill accrue to thein then the in em n the proposed water ater cay sav- Mayor John F. F Bow- Bow Id lId Saturday that the plan will lully tully studied before being t to the cit city commission a 7 require 10 dayt to study La 11 which was approved by th the tUr iter advisory committee and of comm commerce municipal supply committee Friday FrIda the sid Rid T I BEEN IT ire iTe never seen cn the written rei rethe re- re 1 i the savings U plan Mr Bow Bow- Lid id I I discussed i it with Barr Harry Harryn n city engineer at the time tune I t preparing it and that Is as asa asuI uI a I know about it at pr present nt reports n I have c received con- con who doubt it U there are some rome to to tide us over the shortage C expected next sum- sum b the feasibility of oC obtain obtain- o 0 ItCO of oC wat water r from rom Deity tY park puk wells well In this par- par instance the plan seems too tootie UTe tie tieNG WG NG ADDITIONAL majOr said mid that no additional gilon Is 15 being prepared at this the a-the artesian wells ells plan to titled for Cor further discussion C Ie groups next Frida Friday Of orn- orn 1 f Nhe the Suburban Water com com- rill present a revised plan to toute ute ter from Little Cottonwood r T ito to obtain an emergency sup- sup water nur to meet the anticipated at C 2 on Pm rue Ten I i EME EMERGENCY GENCY WATE 9 PUNS SED Continued from rue rage Seven need this summer from sev seven n small pr projects at an expenditure of for equipment and annual annual an an- nual operating costs were unanimously Indorsed by the civic chic water advisory nd committee and the municipal municipal mu rou water supply committee of the chamber of commerce at a n meeting Friday Other an angles les to Salt Lakes Lake's water problem will be heard by the two committees at a Joint meeting at atthe atthe the chamber of ot commerce next Friday Fri Fri- FrIday day at 2 p p. p m. m Among recommendations to be considered will be the tile Increasing of ot water rates to meet the cost of ot the proposed expansion negotiations by the city to acquire all the economic water supplies in Salt Lake valley vaHey and the choice between between be be- be tween the mayors mayor's artesian program and the Little LitlIe Cottonwood project offered by the Suburban Water com corn pany SUGGESTION OPPOSED A second cond recommendation made at atthe atthe the Friday meeting to the effect that the tile city exercise its options on the least expensive water included in the artesian program and proceed with the construction of ot the conduit met with opposition It was d decided that no Indorsement for a permanent supply be made until the new offer oHer of the Suburban Water Vater company is studied A subcommittee of or William R. R Wallace chairman of the Joint committee and a a. group of engineers was appointed cd to confer with company officials before the tile next meeting Under the water savings program for Cor obtaining a supply from springs and exchanges a total toW of 25 second feet foot Is available This It is agreed is sufficient to care for tor the anticipated anticipated antici antici- need during the emergency tills this summer PLAN CLOSE C CHECK ECK It was Wils pointed out that a close check of or the seven sources for tx pollution tion will be made The program as recommended for tor forthe forthe the seven separate projects is as follows follows fol fol- fol- fol lows 1 1 Installation of ot a no pumping unit for Cottonwood exchanges and Holaday Holladay Hol Hol- laday Spring Sprin creek water available 98 capitalized installation Installation lation and operation cost t ner ncr second foot oot 2 Well Vell and pumping plant to supply Walker and Green ditch ex exchanges exchanges ex ex- changes water available 4 second second- feet capitalized Installation and operation op operation op op- cost per second-foot second 3 3 Pipeline to conserve seepage losses in Mill creek channel water available 3 second feet total cost cost per second foot toot 4 Pumping plant to supply Utah lake exchanges to lower Mill creek and White ditch water users water available 35 second feet capitalized Installation and operation cost per second foot Coot 5 5 Pumping plant to utilize Burroughs Burroughs Bur Bur- roughs springs on the tile Nibley park golf gol course water available 1 second foot capitalized Installation abd d op operation operation op- op cost per second foot 6 Pumping plant to pump Fairmount Fairmount Fair Fair- mount springs into the city mains water available 2 second feet cap cap- Installation and operation cost per second foot 7 7 Pumping plant to utilize Liberty Liberty Lib Lib Lib- erty park wells in let the park water available 2 second feet capitalized Installation and operation cost per second cond foot S. S a |