OCR Text |
Show KAISER TO START COKE OVENS AT SUNNYSIDE More than 500 beehive coke ovens will be 'conditioned and ready for operation by April 15 at Sunnyside, according to George Morlock, superintendent of the coke plant for the Kaiser-Fraser Parts Co., Inc. Present . plans call for the coke ovens to be started a few at a time and. gradually increased until full production is reached. At the peak of production, it is expected to turn out approximately 750 tons of coke per day. To improve all facilities in the desired maximum efficiency of transporting and coking the coal, a new railroad track direct from the mines there to the coke oven sites will be constructed, doing away with many sharp curves and steep grades. |