OCR Text |
Show MENDENHALLS AWARDED ROAD CONTRACT G. W. Mendenhall & Sons company com-pany of Springville was the low-bidder low-bidder for the surfacing of two projects in Spanish Fork, with a bid of $62,946.95. The first project is on US-91, beginning- at the Spanish Fork high school, where the present paving pav-ing will be covered with asphalt and widened an additional six feet. The new construction at the cannery can-nery curve revision will be paved with 22 feet of concrete and 10-foot 10-foot shoulders will be left on each side of the paving. The other improvement is on highway 50, beginning between Fifth East and Sixth East in Spanish Span-ish Fork and continuing to Main street. The road will be realigned so as to eliminate the 'present bad curve at the east side of Spanish Fork. Bituminous surfacing will be laid on this part of the highway to a width of 24 feet and the shoulders will be seven feet wide. It is expected that work will begin be-gin ' as soon as the contract is awarded. |