OCR Text |
Show Preliminary Work Underway For New Federal Building Work on the new federal building which will be located on Third South and Main, will begin when the building has been designed in Washington and bids have been let. At the present time a survey of soil investigation Is being made which will be sent to Washington together with the answers to a questionnaire which . gives data in regard to local building conditions,' sewer system, sys-tem, electric light system, water works and streets, and the general gen-eral structure of the homes in Springville. This data will all be used by the department in designing design-ing the building which will be erected here. Postmaster Bird also reveals that according to a letter received receiv-ed from the First Assistant to the Postmaster General, W. W. Howes, in Washington, D. C, the department depart-ment is prepared to authorize the establishment of city delivery service ser-vice in lieu of village service in Springville when the postmaster can report to them that street signs, house markers, and mail receptacles have been provided throughout the carrier delivery territory. In view of this fact, Mr. Bird wishes to urge the people of Springville to do what they can towards complying with these requirements re-quirements so that Springville can have city delivery. |